Juneau celebrates 25 years in business!

Insights

Case Studies
September 5, 2024

Mastering MEP Coordination in Student Housing Renovations

At Juneau, we excel in tackling the unique challenges associated with renovating higher education facilities, particularly student housing. On Clemson University’s Byrnes Hall Renovation project, originally built in 1970, we successfully integrated modern Mechanical, Electrical, and Plumbing (MEP) systems into the older building, ensuring on-time, on-budget delivery despite unforeseen challenges.

Proactive Investigation and Planning

One of our key strengths lies in our proactive approach to identifying and mitigating potential issues. Prior to construction on the Byrnes Hall Renovation, we secured early access to unoccupied dorm rooms to conduct thorough investigations of existing conditions. This allowed us to identify critical elements such as electrical routing, existing wall & stud placements, and the asbestos hazards. Our team was able to begin planning for significant asbestos abatement, a $600k remediation that was accurately quantified and planned for. By collecting detailed data on existing conditions, we were able to fine-tune the project scope, refine pricing, and optimize scheduling.

Leveraging Technology

We understand that older buildings were not designed to accommodate today’s sophisticated MEP systems, which is why we utilize cutting-edge technology to ensure flawless integration. On the Byrnes Hall Renovation project, we used laser scanning to verify structure elevations and detect any deviations from the original documents. This allowed us to create accurate 3D models that guided our installation process, preventing costly rework and ensuring new systems fit perfectly within the existing structure. Our MEP Engineering and VDC teams work hand-in-hand to evaluate as-built information, utilize overhead clash detection early in the design/preconstruction phase, and ultimately ensure all systems fit within the existing overhead space.

When it comes to renovating higher education facilities, especially student housing, you need a partner who can anticipate challenges and deliver solutions with confidence. Whether it’s verifying structural elevations with advanced laser scanning or coordinating the installation of modern MEP systems in tight spaces, Juneau has the expertise to handle every aspect of complex renovation projects.

Back to All Insights